parallel discontinuation

Production Planning and Control (PP)

In parallel discontinuation, a group of materials is replaced by another material at a certain time.

One material is defined as the main material to be discontinued. Once stocks of this material are exhausted, dependent requirements for the whole group of materials are transferred to the follow-up material.